Join Our Official WhatsApp Forum

Egbin Power Graduate Internship Programme 2025

Egbin Power Plc. is West Africa’s largest power generation station with an installed capacity of 1,320 MW consisting of 6 Units of 220MW each.

One of the biggest additions to the electricity industry in Nigeria.

Our future aim is to lead the movement to ‘Light up Nigeria’ and the wider sub-Saharan African region.

Egbin Power Plc. is recruiting for vacant positions.

All Interested candidates are advised to go through available positions carefully and submit their applications appropriately before the deadline.

Apply now for the Egbin Power Graduate Internship Programme 2025.

Egbin PowerUp Internship Programme (Second Half)

Job Specifications:

    • Full Time
    • Required Qualifications: BA/BSC/HND
    • Location: Lagos| Nigeria.
    • Category: Graduate Internship Jobs
    • Deadline: June 10, 2025

Job Description:

  • July 2025- December 2025

Field of Study:

  • Engineering
  • Chemistry
  • Computer Science

Qualifications and Requirements:

  • Students on Second Class Upper(2:1) or its equivalent as at the time of

Field of Study:

  • Engineering
  • Chemistry
  • Computer Science